Назад
15 часов назад

Construction Manager, Data Centre Delivery (AI Data Centers)

140 000 - 200 000$
Формат работы
onsite
Тип работы
fulltime
Грейд
senior
Английский
b2
Страна
US
Вакансия из списка Hirify.GlobalВакансия из Hirify Global, списка международных tech-компаний
Для мэтча и отклика нужен Plus

Мэтч & Сопровод

Для мэтча с этой вакансией нужен Plus

Описание вакансии

Текст:
/
TL;DR
Construction Manager, Data Centre Delivery (AI Data Centers): Leading the on-site construction, commissioning, and handover of high-density, liquid-cooled AI data centers with an accent on safety, quality, schedule, cost, and critical power and cooling infrastructure. Focus on coordinating general contractors and MEP partners, managing accelerated programs, and delivering data halls ready for GPU, network, and rack installation.

Location: Site-based at an Nscale data center campus in Texas, with up to 75% travel between multiple project sites; on-site presence required during critical milestones.

Salary: $140,000–$200,000 USD base salary, with possible bonus, equity, and/or commission programs.

Company

Nscale is a vertically integrated AI cloud that secures power and land, builds data centers, operates GPU infrastructure, and provides software for training and serving AI models.

What you will do

  • Lead day-to-day construction across civil, structural, envelope, and MEP packages through practical completion.
  • Direct general contractors, trade partners, and equipment vendors while coordinating site logistics, sequencing, and interfaces.
  • Coordinate installation of substations, switchgear, UPS, generators, chillers, and liquid-cooling systems.
  • Own site health and safety, inspections, QA/QC audits, incident investigations, snagging, and defect closeout.
  • Track program progress, critical-path risks, budgets, valuations, variations, and project issues.
  • Lead Level 1–5 integrated systems testing and hand over documentation, as-builts, and O&M manuals to Data Centre Operations.

Requirements

  • At least 5 years of construction management experience, including at least 3 years leading mission-critical builds such as data centers, semiconductor fabs, or large industrial facilities.
  • Direct experience managing General Construction Managers, program controls, scheduling and cost functions, EHS leadership, and multi-site subcontractor teams.
  • Strong command of program-level CPM scheduling, budget and cost control, and contract administration.
  • Proficiency with Procore, Bluebeam Revu, and Microsoft Office Suite.
  • Ability to interpret complete civil, structural, architectural, and MEP construction document sets.
  • OSHA 30 certification required.
  • Valid driver’s license and ability to travel between multiple project sites.
  • Integrity, ownership, respectful conduct under pressure, transparent communication, reliability, and a team-first attitude are required; references may address character and conduct.

Nice to have

  • Experience overseeing hyperscale, colocation, or Tier III/IV data center construction programs.
  • Familiarity with DCIM systems, raised-floor environments, and portfolio-level critical power and cooling infrastructure.
  • Experience with program-level reporting and analytics tools such as Power BI.
  • PMP, CCM, or equivalent credential.
  • Bachelor’s degree in Construction Management, Civil Engineering, or a related field; an advanced degree is a plus.
  • Experience with MS Project or Primavera P6.

Culture & Benefits

  • Full-time Nscale employment with regular travel across multiple project sites and schedule flexibility across sites, teams, and time zones.
  • Active construction environment when on site; PPE is required at all times.
  • Private medical cover, pension, generous leave, and potential medical, dental, vision, flexible paid time off, parental leave, and retirement plan benefits.
  • Potential bonus, equity, and/or commission programs in addition to base salary.
  • Opportunities to take on additional sites or programs as the data center pipeline grows.

Будьте осторожны: если работодатель просит войти в их систему, используя iCloud/Google, прислать код/пароль, запустить код/ПО, не делайте этого - это мошенники. Обязательно жмите "Пожаловаться" или пишите в поддержку. Подробнее в гайде →